The groundwork

The price of the groundwork and for scattering earth in the immediate vicinity is valid in as far as the soil does not contain any rocks, springs or any other obstacle that has not been specified upon signing the order. The costs for clearance and transport of earth or taxes for dumping can be calculated for you. The levelling measurements and the stabilization of the pool are carefully checked during the filling up, while the pool is gradually filled with water. The sand for the filling up is stabilized at 150 kg/m³.

The needed equipment is depending on your environment. A smaller crane is necessary in less accessible places.

 